F1867-98 Standard Practice for Installation of Folded/Formed Poly (Vinyl Chloride) (PVC) Pipe Type A for Existing Sewer and Conduit Rehabilitation. This practice covers the procedures for the rehabilitation of sewer lines and conduits 4 in. (102 mm) to 18 in. (457 mm) in diameter by the insertion of a folded/formed PVC pipe that is heated, pressurized, and expanded to conform to the wall of the original conduit forming a new structural pipe-within-a-pipe. This rehabilitation process can be used in a variety of gravity applications such as sanitary sewers, storm sewers, and process piping.

Looking for a Metal Building? More search options

Trenchless Technology: Documents: Specifications and Standards: ASTM F1867-98 Standard Practice for Installation of Folded: Formed Poly (Vinyl Chloride) (PVC) Pipe T  Previous Next
 

ASTM F1867-98 Standard Practice for Installation of Folded/Formed Poly (Vinyl Chloride) (PVC) Pipe T


F1867-98 Standard Practice for Installation of Folded/Formed Poly (Vinyl Chloride) (PVC) Pipe Type A for Existing Sewer and Conduit Rehabilitation. This practice covers the procedures for the rehabilitation of sewer lines and conduits 4 in. (102 mm) to 18 in. (457 mm) in diameter by the insertion of a folded/formed PVC pipe that is heated, pressurized, and expanded to conform to the wall of the original conduit forming a new structural pipe-within-a-pipe. This rehabilitation process can be used in a variety of gravity applications such as sanitary sewers, storm sewers, and process piping.


http://www.astm.org/cgi-bin/SoftCart.exe/DATABASE.CART/PAGES/F1867.htm?L+mystore+ifma3146.

 
HOMENEW LINKSCOOL LINKSNEWSLETTERRANDOM LINKSUBMIT A SITESEARCH

metalbuilding.info Metal Building Directory